| Section Υ: 1958 Excavation Report ... Dorothy Burr Thompson ... Two areas at the north foot of the Areopagus were uncovered. The first area did not yield much of interest due to modern disturbances. Excavations of a well, three pits and a water channel produced however ... 3 Mar-3 May 1958 ... Excavations of a well, three pits and a water channel produced however ancients material.
... Some traces of the West Street running north-south with a water-channel underneath, appeared. ... B.C. due to the reorganization after the Persian Wars. The water channel probably went out of use after the Herulian destruction.
|
| Preliminary Report on the 2007 Excavation Season ... John McK. Camp II ... Excavation continued this year in the sections ΒΖ, ΒΗ and Γ.
In Section ΒΖ South, two areas were investigated: the north-south road and the areas west of the road. In the road, hard-packed gravel surfaces ... 13 Jun-3 Aug 2007 ... In the road, hard-packed gravel surfaces were taken out, and the later water supply lines, one of terracotta and two of lead, were fully exposed. More of the deep street drain and another subsidiary channel entering it from the west, were cleared. ... A draw-shaft and part of the tunnel of a Hellenistic cistern complex was found outside the building to the east. |
|
|