Q-R 10-11:1: Construction Fill Below Floor of Brick Building

Construction fill below floor of Brick Building. Areas involved: a) Western portion of Room A: packing below floor. b) Room B: packing below floor of northern,larger room. c) Fill over water channel in ... First quarter 2nd century, before its end ... Construction fill below floor of Brick Building. Areas involved: a) Western portion of Room A: packing below floor. b) Room B: packing below floor of northern,larger room. c) Fill over water channel in smaller, southern room B; channel discovered by builders of Brick Building,rebuilt by them and covered over. d) Foundation trench of earlier building beneath Brick Building, filled and covered by builders of Brick Building. e) "Apparently from below floor of building" (nb.p. 1282). ... However, HAT digging in the same area in 1950 (p. 2245), describes what appears to be the same stratum (he does not specifically mention the earlier excavations) as lying on the floor of Brick Building here.

Q-R 10-11:2: Floor of Mudbrick Building

Floor of Mudbrick Building. The material from this deposit comprises what was found on the floor of the Brick Building, as opposed to the fallen brick fill Coins: 24 February 1936 #1-#3 SS 11078-SS 11079 ... To ca. 165 B.C ... Floor of Mudbrick Building. The material from this deposit comprises what was found on the floor of the Brick Building, as opposed to the fallen brick fill

Q-R 10:1: Fill Under Floor of Mudbrick Building Under Stoa of Attalos

Stoa of Attalos (Shop VI), between poros orthostates of front wall. No deposit list ... Fill Under Floor of Mudbrick Building Under Stoa of Attalos

O-R 7-10: Construction Fill

Square Peristyle (Square Building) Constructions fill + other (square peristyle area); fragmentary and with some earlier material but in the main, where undisturbed, a homogenous deposit. Coins: 26 May ... Î’efore 300 B.C ... Square Peristyle (Square Building) Constructions fill + other (square peristyle area); fragmentary and with some earlier material but in the main, where undisturbed, a homogenous deposit ... From Square Building construction fill. ... Cutting floor of Square Building