Image: 2023.14.0041Backfilling of Section ΒΘ, day 5. Panoramic view of the site; backfilling in progress. A second retaining wall of sandbags are buing built. Most of the area covered in geotextile and gravel.
image
Archive Number:   2023.14.0041
Title:   Backfilling of Section ΒΘ, day 5. Panoramic view of the site; backfilling in progress. A second retaining wall of sandbags are buing built. Most of the area covered in geotextile and gravel.
Photographer:   Pia Kvarnström
Date:   12 May 2023
Rating:   1
Section:   ΒΘ
    ΒΖ
    ΒΚ