Image: 2023.14.0041: Backfilling of Section ΒΘ, day 5. Panoramic view of the site; backfilling in progress. A second retaining wall of sandbags are buing built. Most of the area covered in geotextile and gravel. | Archive Number: | | 2023.14.0041 | | Title: | | Backfilling of Section ΒΘ, day 5. Panoramic view of the site; backfilling in progress. A second retaining wall of sandbags are buing built. Most of the area covered in geotextile and gravel. | | Photographer: | | Pia Kvarnström | | Date: | | 12 May 2023 | | Rating: | | 1 | | Section: | | ΒΘ | | | | ΒΖ | | | | ΒΚ |
|