Image: 2023.14.0027Backfilling of Section ΒΘ, day 3. Gravel covering the geotextile. At left, the retaining wall made of sandbags and covered in geotextile.
image
Archive Number:   2023.14.0027
Title:   Backfilling of Section ΒΘ, day 3. Gravel covering the geotextile. At left, the retaining wall made of sandbags and covered in geotextile.
Photographer:   Eirini Dimitriadou
Date:   10 May 2023
Rating:   2
Section:   ΒΘ
    ΒΚ