| Archive Number: | 2012.55.0168 | |
| Title: | Pouring the first section of the concrete roof slab. This stage in construction is marked by the erection of a flowery cross. | |
| Negative: | 80-80 | |
| Looking: | southeast | |
| Date: | 15 Mar 1956 | |
| Rating: | 2 | |
| Section: | ΣΑ | |
| Storage: | Drawer 7 | |
| References: | Image: 1997.07.0440 (80-80) |